Pharmaceutical Projects
| |
Medochemie WFI System |
| Project Description |
WFI production, storage and distribution
system |
| Engineering Services |
System Hydraulic Calcs
P&I Diagram
Equipment Sizing
General Arrangement Drawings
Piping Isometrics
Material Specification and Bill of Quantities
Instrument Data Sheets
|
| Cost of Associated Services |
US$ 300.000 |
| Date of Construction |
1998-2000 |
| |
BIOGENA Factory |
| Project Description |
Biogena process Utilities Systems |
| Engineering Services |
All utility systems including, Steam, Chilled Water, MeOH cooling
water, Nitrogen, Vacuum, Compressed Air, Purified Water etc.
P&I Diagrams for all systems
General Arrangement Drawings
Piping Isometrics
Instrument Data Sheets |
| Cost of Associated Services |
US$ 200.000 |
| Date of Construction |
1998-2000 |
| |
Medochemie Cephalosporin Manufacturing
Facility |
| Project Description |
Cephalosporin Manufacturing Facility
Process HVAC, Building Automation and M&E services |
| Engineering Services |
All utility systems including, Steam, Chilled Water,
Nitrogen, Vacuum, Compressed Air, Purified Water
etc.
P&I Diagrams for all systems
General Arrangement Drawings
Piping Isometrics Instrument
Data Sheets |
| Cost of Associated Services |
US$ 500.000 |
| Date of Construction |
2002 |
| |
Mundipharma Cyprus Ltd Manufacturing Facility |
| Project Description |
Purified Water Generation and Distribution System |
| Engineering Services |
Purified water and other Process Systems
General Arrangement Drawings
Piping Isometrics
Instrument Data Sheets
Validation FDS, IQ, OQ Documents
|
| Cost of Associated Services |
US$ 500.000 |
| Date of Construction |
2003-2004 |
| |
Medochemie Cyprus Ltd Injectables Manufacturing Facility |
| Project Description |
HVAC, Process and Utilities System |
| Engineering Services |
HVAC System, Purified water and other Process Systems
General Arrangement Drawings
Piping Isometrics
Instrument Data Sheets
Validation FDS, IQ, OQ Documents
|
| Cost of Associated Services |
US$ 100.000 |
| Date of Construction |
2004-2005 |
|
|