Power Projects

  Asir Power Station Extension
Project Description 1 x 50 MW GT, Extension of the ASIR Power Plant in Saudi Arabia
Engineering Services Fire Fighting System Design
Cost of Associated Services US$ 500.000
Date of Construction 1993-1994

  JIZAN Power Station Extension
Project Description 1 x 50 MW GT, Extension of the JIZAN Power Plant in Saudi Arabia
Engineering Services Fire Fighting System Design
Cost of Associated Services US$1.000.000
Date of Construction 1993-1994

  DUBA Power Plant Extension
Project Description 3 x 25 MW GT Power Plant Extension
Engineering Services Fuel Oil System including Tanks, Purification Plant, Fuel Forwarding and filtration skids Fire Fighting System Design including Transformer Deluge Systems, CO2 System Fire Water & Foam Ring Main and Fire Pump Installations Fire Detection & Alarm System Design Mechanical & Electrical Building Services Water Supply System & Water Treatment Plant Compressed Air System Industrial & Oily Water Drainage System

Cost of Associated Services US$ 5.000.000
Date of Construction 1996-1998

  NAJRAN Power Plant Extension
Project Description 1 x 50 MW GT Power Plant Extension
Engineering Services Fuel Oil System including Tanks, Purification Plant, Fuel Forwarding and filtration skids Fire Fighting System Design including Transformer Deluge Systems, CO2 System etc Fire Water & Foam Ring Main and Fire Pump Installations Fire Detection & Alarm System Design Mechanical & Electrical Building Services Water Supply System & Water Treatment Plant Industrial & Oily Water Drainage System

Cost of Associated Services US$ 4.000.000
Date of Construction

1996-1998

Substations

  400 KV AQABA Substation
Project Description 1 x 50 MW GT Power Plant Extension
Engineering Services

Complete Engineering Design for the following :
Fire Fighting System Design including Transformer Deluge Systems, Fire Ring Main Fire Pump Installations Fire Detection & Alarm System Design Heating & Ventilation System for GIS & Control Building Mechanical & Electrical Building Services Overhead Crane Installation

Cost of Associated Services US$ 2.000.000
Date of Construction

1995-1996


  132KV ABHA Substation
Project Description 132KV/33/13.8 KV AQABA substation
Engineering Services

Complete Engineering Design for the following :
Fire Fighting System Design including Transformer Deluge Systems, Fire Ring Main, Fire Pump Installations
Fire Detection & Alarm System Design Heating & Ventilation System for GIS & Control Building Mechanical & Electrical Building Services

Cost of Associated Services US$ 1.500.000
Date of Construction

1995-1997

Refineries

  Jeddah Samarec Refinery
Project Description Replacement of 25MW Gas Turbine Intake Filter
Engineering Services Engineering Design and Site Supervision of the erection of the Self cleaning filters for the Gas Turbine and the Generator Air

Cost of Associated Services US$ 800.000
Date of Construction

1993