Industrial Buildings
| |
Entex Texturizing Ltd |
| Project Description |
Texturizing Factory Industrial Installations |
| Engineering Services |
Complete Engineering Design for
the following:
Central Chilled Water Plant 1000
KW capacity
Central AHU with Chilled Water
Air Washer, 120.000 cu.m./hr
HVAC control System
Electrical Power & Distribution
Compressed Air Plant and distribution |
| Cost of Associated Services |
US$ 1.000.000 |
| Date of Construction |
1989-1990 |
| |
Transmitter Facility |
| Project Description |
Transmitter Building at the British
Base in Akrotiri Cyprus |
| Engineering Services |
Complete Engineering Design for
the following :
Central Chilled Water Plant 250 KW
Central AHU 40.000 cu.m./hr
All Air System for the Transmitter
Hall
Six -Zone central CO2 Automatic
Fixed Extinguishing System
|
| Cost of Associated Services |
US$ 400.000 |
| Date of Construction |
1995 |
| |
Military Facility Building |
| Project Description |
Military Facility Operation Building
at the British Base in Akrotiri Cyprus |
| Engineering Services |
Complete Engineering Design for
the following:
All Air System with zone close temperature
control
Associated Electrical Services
|
| Cost of Associated Services |
US$ 500.000 |
| Date of Construction |
1995 |
| |
Photographic Section Facility Building |
| Project Description |
Photogra Building at the British
Base in Akrotiri Cyprus |
| Engineering Services |
Complete Engineering Design for
the following:
Multizone All Air System
Variable Air & Temperature
System
Associated Electrical Services
|
| Cost of Associated Services |
US$ 300.000 |
| Date of Construction |
1997 |
Office Complexes
| |
Seascope Interorient Offices |
| Project Description |
Large Office Complex |
| Engineering Services |
Complete Engineering Design for
the following:
Central Chilled Water Plant 300 KW
capacity
Central All Water FCU System
Independent Central Conditioned
Air Supply System
Independent Central Exhaust
Air System
Electrical Building Services
|
| Cost of Associated Services |
US$ 500.000 |
| Date of Construction |
1990-1991 |
| |
Columbia Offices |
| Project Description |
Luxurius Office Complex
|
| Engineering Services |
Complete Engineering Design for
the following:
Central Chilled Water Plant 200 KW
capacity
Central All Water FCU System
Electrical Building Services
|
| Cost of Associated Services |
US$ 200.000 |
| Date of Construction |
1991-1992 |
| |
Logica Offices Complex |
| Project Description |
Large Office Complex in Limassol |
| Engineering Services |
Complete Engineering Design for
the following:
Unitary type Air Conditioning System
Ventilation System
Electrical Building Services
Plumbing Services
|
| Cost of Associated Services |
US$ 600.000 |
| Date of Construction |
1996-1998 |
| |
GALA Offices |
| Project Description |
Luxurius Office Complex in Limassol |
| Engineering Services |
Complete Engineering Design for
the following:
Variable Refrigerant Volume Air Conditioning
System
Electrical Building Services
|
| Cost of Associated Services |
US$ 600.000 |
| Date of Construction |
1997-1998 |
Hotel Buildings
| |
Columbia Hotel |
| Project Description |
Luxurious 5-star Beach Hotel |
| Engineering Services |
Complete Engineering Design for
the following:
Central Chilled Water Plant
Central Heating Water Plant
All Air System for Common
Areas
Central All Water FCU System
for the hotel rooms
Independent Central Conditioned
Air Supply System
Independent Central Exhaust
Air System
Solar System for Hot Water
Production
Electrical Building Services
|
| Cost of Associated Services |
US$ 4.000.000 |
| Date of Construction |
1991-1992 |
| |
Atlantica Hotel |
| Project Description |
3-star Hotel at Limassol |
| Engineering Services |
Complete Engineering Design for
the following:
Central Chilled Water Plant
Central Heating Water Plant
All Air System for Common
Areas
Central All Water FCU System
for the hotel rooms
Solar System for Hot Water
Production
|
| Cost of Associated Services |
US$ 400.000 |
| Date of Construction |
1991-1992 |
| |
Plaka Hotel Apts |
| Project Description |
Luxurious Hotel Apts at Lastsi Paphos |
| Engineering Services |
Complete Engineering Design for
the following:
Central Chilled Water Plant with
all water FCU System for the common Areas
Unitary Type Air-Conditioning
System for the apartments
Solar System for Hot Water
Production
|
| Cost of Associated Services |
US$ 500.000 |
| Date of Construction |
1992-1993 |
Medical Facilities
| |
Apollonion Medical Center |
| Project Description |
Large Medical Center in Nicosia |
| Engineering
Services |
Complete Engineering Design for
the following:
Central Chilled Water Plant 300 KW
capacity
All Water FCU System
Operating Theater Air-Conditioning
System
Central Medical gases Central
Plant and Distribution
Plumbing Services
Electrical Building Services
|
| Cost of Associated Services |
US$ 1.000.000 |
| Date of Construction |
1989-1990 |
| |
Saint George Polyclinic |
| Project Description |
Medical Center in Paphos |
| Engineering Services |
Complete Engineering Design for
the following:
Unitary Type Air-Conditioning System
Central Medical gases Central
Plant and Distribution
Plumbing Services
Electrical Building Services
|
| Cost of Associated Services |
US$ 500.000 |
| Date of Construction |
1991 |
|
|